Epping Public School required a new covered access route to a cluster of demountable classrooms located in a secluded section of the school. The existing narrow concrete pathway offered no weather protection and presented trip and safety hazards. The site’s confined location and the need to maintain uninterrupted student access during construction added complexity. The school sought a compliant, durable and aesthetically cohesive solution that could integrate with the existing campus infrastructure and allow for future demountable relocation if required.
Walkwayz delivered a customised covered walkway system spanning 65 linear metres, connecting the main school buildings to the demountable classrooms, providing all-weather protection and safe passage for kids and teachers alike. Key features included:
All works were completed on time and within budget, despite the complexities of site constraints and the need to maintain daily school operations.
The new walkway has transformed access and safety for students and staff moving between classrooms at Epping Public School. The project achieved:
As Walkwayz’ first ever project this was a significant milestone for the team and its ability to deliver custom-engineered walkways that balance safety, compliance, and design excellence, even within tight access and operational constraints. The positive feedback from the client highlights Walkwayz’ enduring commitment to quality, collaboration and compliance.
Get in touch today to discuss your project needs.